Make the demo available for team review
September 30, 2026
Demo improvement · Across launch phases · Completed work and checks
Historical work completed by 2026-09-30; recorded retrospectively on October 15, 2026. This record does not represent newly completed work in the current week or stakeholder approval.
The initial Andy-controlled staging release and its delivery checks are complete. This is not the later HOL-owned hosting setup or a production-ready member service.
Implementation status is separate from stakeholder approval and publication.
Goal
As an HOL reviewer, I want a shared web address for the prototype so I can review it without running a local development environment.
How to check
- Read the dated September30 deployment and verification record below.
- This is a technical delivery review; no member click-through proves the historical deployment.
- Treat the current staging site as a later build at the same review location; the recorded version identifies the historical release.
Historical completion criteria
- Provide a stable publicly reachable staging address limited to the Backcountry application route.
- Package the prototype images and verify the delivered image payloads.
- Verify Home, Roadmap and connected workflow review states, including phone layout.
- Preserve the existing portfolio/mail environment and keep real authentication, member data, email and payments disconnected.
Recorded results · 1 item
Historical changes and the verification recorded at the time. Links to current references may include later revisions.
- Completed:
Publish and verify the initial shared review build
technical review- Where:
- Andy-controlled Backcountry staging
- What changed:
- Published the scoped staging Worker, corrected base-path image delivery and checked the shared review screens on phones.
- Expected result / How to check:
- Read the dated release record and its recorded checks rather than attempting private hosting operations.
Evidence: September30 release version5d165aa0-9185-4ac3-bcbc-f693b2d279ef; log records live page/image verification and390px Home/Roadmap/workflow checks. No live backend was connected.
Historical work completed by October 7, 2026; recorded retrospectively on October 15. Current screens may include later revisions.